Phase 1 Truck Haul Update
ST Wooten worked through March 30, 2023 placing 24,419 CY’s of sand on the beach. Sand was placed in the area immediate to the South of the Reef including buildings 5 through 8, as well as 100 feet South of the Reef. The remaining 20,581 CY’s of sand will be placed when we resume operations in the Fall of 2023.